Tapper Interiors were appointed as the interior fit out sub-contractor at Windrush Health Centre.

What we did

We provided a high standard of finish throughout the building with several curved walls and bulkheads, as well as differing ceiling types.

As the Fit out sub-contractor – Tapper Interiors installed:

  • Internal stud partitions including curved walls
  • Plasterboard and grid/tile suspended ceilings, including curved sections and bulkheads
  • External Metsec cladding rails  and plywood panels ready to receive finishes by others
  • Fire barriers
  • Internal doorsets
  • Joinery

How we made a difference

We co-ordinated well with other trades to ensure that areas were completed in a sequence to allow the programme to be accelerated.  We also successfully negotiated the external works after being appointed for the internal fit out.

Client

Beam Construction Ltd

Value

£500,000

Scope

  • New building fit out
  • External cladding rails

Duration

26 weeks

Sector

Health

“All aspects of the work including suspended ceiling, metal stud partitioning and carpentry works were carried out diligently, professionally and to a very high standard. This was aided by an extremely efficient and conscientious Site Foreman who supervised the operations. I would have no hesitation in working with Tapper Interiors in the future and in fact look forward to the prospect of working together on future contracts”